← All tribunal records
BuyTrust building report

2556 E Hastings St

2556 E Hastings St, Vancouver · Hastings-Sunrise

See the whole Hastings-Sunrise risk profile →
Risk read
High · Common property & use
2
decisions
20222026
span
6
issues
1/2
owner wins

What this building’s record shows

2556 E Hastings St has been before the BC Civil Resolution Tribunal 2 times (20222026), surfacing 6 distinct issues across 5 categories. The dominant theme is common property & use, and the highest-severity issue on record is rated high. Owners prevailed in 1 of 2 decisions; total awards on record: $4,411.

Each category below explains what that pattern means for a buyer, with the building’s own decisions as evidence.

Common property & use

Elevated severity2 decisions

Boundaries, parking, and renovation disputes — who controls and can alter shared space. Usually lower-stakes individually, but frequent cases show ongoing friction between owners and the board.

Boundary Issues · 1Parking Issues · 1

Maintenance & upkeep

Low severity2 decisions

Deferred repairs and general upkeep. Minor on their own, but alongside structural cases they reinforce a picture of a building falling behind.

Maintenance Deficiency · 2

Water, envelope & structural

High severity1 decision

Water ingress, roof, and building-envelope failures are the most expensive problems a condo faces, and they’re what drive large special assessments. Structural cases on record are the strongest reason to commission an engineer’s review of the envelope.

Water Damage · 1

Building systems & safety

Elevated severity1 decision

Electrical, HVAC, elevators, and fire safety. Disputes here point to aging or contested infrastructure — confirm the status of major systems and whether any fire-safety orders are outstanding.

Plumbing Systems · 1

Governance & council conduct

Elevated severity1 decision

How the corporation is actually run — records access, meetings, bylaw enforcement, transparency. Repeated governance cases signal a contentious or opaque council, and that colours every decision made about your money and your building.

Governance Issues · 1

The decisions

Every tribunal decision linked to this building, newest first.

2026 BCCRT 757 (CanLII)
2026-05-14Decided
2022 BCCRT 956
2022-08-26Owner won$4,411

A bathroom sink shut-off valve failed in a strata unit, causing water damage to that unit and the one below. The tribunal determined the owner was liable for $4,148.21 in emergency restoration costs since the faulty valve was within the strata lot boundaries and damages fell under the insurance deductible.

Who runs this building

Colyvan Pacific Property Management

Across 74 buildings, this manager has 23 tribunal cases on record — a dispute rate of 6.23 per 100 units. A manager’s portfolio-wide rate is a signal of how they run buildings generally, beyond this one address.

Sourced from published tribunal decisions and analysed by PropTrust. Not legal advice. Verify with the corporation and a licensed professional before purchase.