← All tribunal records
BuyTrust building report

Tropez

2263 Redbud Ln, Vancouver · Kitsilano

See the whole Kitsilano risk profile →
Risk read
High · Building systems & safety
2
decisions
20192019
span
5
issues
0/2
owner wins

What this building’s record shows

Tropez has been before the BC Civil Resolution Tribunal 2 times (20192019), surfacing 5 distinct issues across 4 categories. The dominant theme is building systems & safety, and the highest-severity issue on record is rated high. Owners prevailed in 0 of 2 decisions; total awards on record: $0.

Each category below explains what that pattern means for a buyer, with the building’s own decisions as evidence.

Building systems & safety

Elevated severity2 decisions

Electrical, HVAC, elevators, and fire safety. Disputes here point to aging or contested infrastructure — confirm the status of major systems and whether any fire-safety orders are outstanding.

Electrical Systems · 1HVAC Systems · 1

Governance & council conduct

Elevated severity2 decisions

How the corporation is actually run — records access, meetings, bylaw enforcement, transparency. Repeated governance cases signal a contentious or opaque council, and that colours every decision made about your money and your building.

Governance Issues · 2

Water, envelope & structural

High severity1 decision

Water ingress, roof, and building-envelope failures are the most expensive problems a condo faces, and they’re what drive large special assessments. Structural cases on record are the strongest reason to commission an engineer’s review of the envelope.

Roof Envelope · 1

Common property & use

Elevated severity1 decision

Boundaries, parking, and renovation disputes — who controls and can alter shared space. Usually lower-stakes individually, but frequent cases show ongoing friction between owners and the board.

Boundary Issues · 1

The decisions

Every tribunal decision linked to this building, newest first.

2019 BCCRT 948
2019-08-08Corporation upheld

Two strata lot owners disputed the strata corporation's management decisions regarding delayed approval processes for an air conditioning installation, alleged inconsistent application of bylaws, and concerns about council behavior. The tribunal ruled in favor of the strata corporation, determining that proper procedures were followed.

2019 BCCRT 826
2019-07-09Corporation upheld

The applicant sought permission to install air conditioning units that would require penetrating the building's exterior wall. The strata corporation declined the request due to worries about structural integrity, accumulated effects on the building, noise issues, and engineering assessment costs.

Who runs this building

Tribe Management

Across 135 buildings, this manager has 24 tribunal cases on record — a dispute rate of 1 per 100 units. A manager’s portfolio-wide rate is a signal of how they run buildings generally, beyond this one address.

Sourced from published tribunal decisions and analysed by PropTrust. Not legal advice. Verify with the corporation and a licensed professional before purchase.