← All tribunal records
BuyTrust building report

1855 Stainsbury Ave

1855 Stainsbury Ave, Vancouver · Kensington-Cedar Cottage

See the whole Kensington-Cedar Cottage risk profile →
Risk read
High · Water, envelope & structural
2
decisions
20232024
span
4
issues
0/2
owner wins

What this building’s record shows

1855 Stainsbury Ave has been before the BC Civil Resolution Tribunal 2 times (20232024), surfacing 4 distinct issues across 3 categories. The dominant theme is water, envelope & structural, and the highest-severity issue on record is rated high. Owners prevailed in 0 of 2 decisions; total awards on record: $0.

Each category below explains what that pattern means for a buyer, with the building’s own decisions as evidence.

Water, envelope & structural

High severity2 decisions

Water ingress, roof, and building-envelope failures are the most expensive problems a condo faces, and they’re what drive large special assessments. Structural cases on record are the strongest reason to commission an engineer’s review of the envelope.

Roof Envelope · 1Water Damage · 1

Common property & use

Low severity1 decision

Boundaries, parking, and renovation disputes — who controls and can alter shared space. Usually lower-stakes individually, but frequent cases show ongoing friction between owners and the board.

Parking Issues · 1

Maintenance & upkeep

Low severity1 decision

Deferred repairs and general upkeep. Minor on their own, but alongside structural cases they reinforce a picture of a building falling behind.

Maintenance Deficiency · 1

The decisions

Every tribunal decision linked to this building, newest first.

2024 BCCRT 705
2024-07-24Corporation upheld

The owner experienced water damage when a roof deck membrane failed in the strata lot above hers. She claimed the strata corporation was negligent and sought damages. The tribunal rejected her case, determining the strata had acted appropriately by conducting professional assessments, obtaining repair estimates, and getting owner consent for $253,000 in deck work prior to the membrane failure.

2023 BCCRT 1010
2023-11-22Decided

A dispute arose between strata lot owners regarding parking matters within their strata corporation. The tribunal decision lacks substantive content including findings, analysis, or final orders, preventing determination of how the parking conflict was resolved.

Who runs this building

Rancho Management

Across 152 buildings, this manager has 64 tribunal cases on record — a dispute rate of 2.97 per 100 units. A manager’s portfolio-wide rate is a signal of how they run buildings generally, beyond this one address.

Sourced from published tribunal decisions and analysed by PropTrust. Not legal advice. Verify with the corporation and a licensed professional before purchase.