← All tribunal records
BuyTrust building report

5288 Melbourne St

5288 Melbourne St, Vancouver · Renfrew-Collingwood

See the whole Renfrew-Collingwood risk profile →
Risk read
High · Water, envelope & structural
2
decisions
20192021
span
3
issues
1/2
owner wins

What this building’s record shows

5288 Melbourne St has been before the BC Civil Resolution Tribunal 2 times (20192021), surfacing 3 distinct issues across 3 categories. The dominant theme is water, envelope & structural, and the highest-severity issue on record is rated high. Owners prevailed in 1 of 2 decisions; total awards on record: $1,658.

Each category below explains what that pattern means for a buyer, with the building’s own decisions as evidence.

Water, envelope & structural

High severity1 decision

Water ingress, roof, and building-envelope failures are the most expensive problems a condo faces, and they’re what drive large special assessments. Structural cases on record are the strongest reason to commission an engineer’s review of the envelope.

Water Damage · 1

Governance & council conduct

Elevated severity1 decision

How the corporation is actually run — records access, meetings, bylaw enforcement, transparency. Repeated governance cases signal a contentious or opaque council, and that colours every decision made about your money and your building.

Governance Issues · 1

Maintenance & upkeep

Low severity1 decision

Deferred repairs and general upkeep. Minor on their own, but alongside structural cases they reinforce a picture of a building falling behind.

Maintenance Deficiency · 1

The decisions

Every tribunal decision linked to this building, newest first.

2021 BCCRT 1009
2021-09-16Corporation upheld$113

The strata corporation violated regulations by blocking owners from the October 2020 annual meeting and imposing limited proxy voting without electronic access options. Since a May 2021 meeting allowed electronic participation with similar voting matters, requests for additional meetings were denied as unnecessary. Partial fee reimbursement was awarded.

2019 BCCRT 1124
2019-09-24Owner won$1,545

A water leak originated from an upper strata lot and damaged the ceiling and flooring of a lower strata lot on September 1, 2018. The tribunal determined the upper unit respondents were negligent and awarded the applicant $1,260 for repairs, plus interest and fees totaling $285.43.

Who runs this building

Dwell Property Management

Across 77 buildings, this manager has 29 tribunal cases on record — a dispute rate of 1.9 per 100 units. A manager’s portfolio-wide rate is a signal of how they run buildings generally, beyond this one address.

Sourced from published tribunal decisions and analysed by PropTrust. Not legal advice. Verify with the corporation and a licensed professional before purchase.